Construction Disputes Resolution – Arbitration

Blog image

Although Arbitration has fallen from favour in recent years in the United Kingdom as a disputes resolution process for construction contract disputes due to the preference for adjudication, it is still a valid form of resolving conflicts in a non-litigious manner, and is especially favoured as a disputes resolution method for determining complex cases crossing multiple international jurisdictions.

Arbitration in the UK is governed by the Arbitration Act 1996

The Definition of Arbitration

Arbitration is the settling of a dispute between two parties by a neutral third party, known as an Arbitrator.  As well as resolving construction disputes, Arbitration is used in many other areas which can lead to disagreements including; employment, maritime and financial services.

For Arbitration to occur, both parties to the dispute must agree to arbitrate.  There is usually a clause in the construction contract allowing for Arbitration proceedings to be launched if a dispute arises, but parties can agree to Arbitration even if such a clause does not exist.

The Arbitrator will listen to both sides of the dispute, and consider any evidence such as witness opinions, documents and expert opinions.

Once the Arbitrator reaches his decision, he or she publishes it as an award, which is binding on both parties.

The Advantages of Arbitration over Litigation in Construction Contract Disputes

 

  • The proceedings are private, thereby protecting each party’s commercial reputation          

  • The parties to the dispute have the power to choose the Arbitrator (for example, for his or her engineering or commercial knowledge)          

  • Proceedings are less formal than Court proceedings, (the Arbitration can be held in a hotel conference room for example)          

  • Decisions are binding, and the Courts will enforce them         

  • Arbitration has generally been seen as more cost-effective than litigation; however, this becoming less and less the case

 

The Disadvantages of the Arbitration Process

 

  • An Arbitration has many similarities to litigation, and, therefore, can end up costly and time-consuming         

  • Rights to appeal are limited          

  • Both parties must pay the Arbitrator’s costs

 

A Brief Guide to the Arbitration Process

Under the Arbitration Act 1996, the following procedure should be followed when commencing Arbitration:

 

  • Before commencing Arbitration, the parties must refer the construction contract and check as to whether or not alternative forms of dispute resolutions need to be tried beforehand.  If there is an agreed tiered process of dispute resolution set out in the contract, the Courts have shown that they will try to uphold the clause (Channel Tunnel, Mackley v Gosport, Cable & Wireless, Cott v FE Barber, Holloway v Chancery Mead).          

  • Applicants also need to check any time restrictions under the construction contract or the Limitations Act 1980.         

  • Arbitration commences under the Act with the service of a Notice requiring Arbitration which essentially requires the other party to comply with their obligations under the Arbitration Agreement.  The notice must clearly identify the dispute which is being sent to Arbitration.         

  • The Respondent, on having received the Notice of Arbitration, must participate in the appointment of an Arbitrator.

 

Using Arbitration to Resolve International Construction Contract Disputes

There are a number of reasons why Arbitration is the preferred method of solving disputes, where one party to the disagreement is based in the UK and the other in an overseas jurisdiction. These include:

 

  • The fact that the parties to the dispute are free to chose an Arbitrator, who has expertise and experience in the area surrounding the conflict.         

  • The neutrality of the Arbitration process, which is especially attractive if one party to the dispute has very little knowledge of the legal and court process in the nation where the other party resides.         

  • Arbitration awards can be enforced in other jurisdictions that are signatories to the 1958 Convention on the Recognition and Enforcement of Foreign Arbitral Awards (commonly known as the New York Convention).  There are currently 150 countries which have signed the Convention.  Court judgments cannot be enforced in this way and with such ease in foreign jurisdictions.

 

According to a 2010 survey by Queen Mary University, London is the most popular Arbitration seat for corporations. The popularity of London is due to its reputation as a neutral and impartial jurisdiction, the prevalence of English law as the governing law of the contract and the large pool of specialist solicitors, barristers and arbitrators available.

To find out more about how Arbitration can work to resolve your construction contract dispute, please phone our London office on 0207 993 6960 to talk to one of our disputes resolution team.

Follow our company page on linkedin for future updates and our views on the latest developments

Categories: Adjudication

Please leave a comment

Enter the name you would like to appear on the comment.
(required)
Enter the email you would like to use to get updates. You email is not visible and can not be used by other users.
(required)
Enter you comment help.

 
  Post Comment

Book Launch - 27 November 2019

Will you be joining us?

HSE and Environment Agency prosecution: A new climate

27 November 2019 | Bloomsbury, 50 Bedford Square, London, WC1B 3DP

Event Registration

First name
Surname
Email address
Any additional information
Post/Event URL
Post/Event Title
CAPTCHA image
Enter the code shown above in the box below.

Tag Cloud

‘fit for purpose’ obligations 2016 Adjudication adjudication lawyer Adjudication Notice Adjudication process appeal appointing an adjudicator Arbitration Artificial Intelligence Asbestos benefits of off-site construction bonfires book launch breach of contract Brexit Building Defects business interruption Business Interruption Insurance CDM CDM Regulations chambers and partners Charlotte Waters civil proceedings claim payments Claims client COMAH commercial contracts complex construction claims Compliance compulsory sprinklers in warehouses consequential loss construction Construction Construction & Engineering construction contract Construction contract dispute Construction contracts Construction dispute construction dispute lawyer construction dispute resolution construction dispute resolution solicitor construction dispute solicitors Construction Disputes Resolution Construction industry Construction Magazine contracts Contribution claim Corporate Manslaughter Corporate Responsibility costs criminal investigation criminal proceedings cut out fuse Defective Building Work Defective Premises Act developer developers disadvantages of off-site construction Disaster disaster claim Disasters Dispute dispute resolution Disputes DPA Dr Louise Smail Emergency response Emergency Response Solicitors enforcement notices Engineering Engineering dispute Environment Agency environment law Environmental Environmental Agency Environmental damage Environmental Law environmental waste EU EU Procurement Europe Evidence Expert evidence expert witness falls from height Fatal Accidents fee for intervention Fees For Intervention FFI FIDIC Contracts fine Fines Fire Fire Claim fire claims fire damage fire damage lawyers fire sprinkler systems fireworks flood flood claim flood damage food hygiene Fracking fracking claims Fraudulent claims FSW Gross Negligence Manslaughter Guide to Adjudication H&S fine increases; health and safety fines; Health & Safety health & safety breach health & safety sentences health & safety sentencing guidelines health & safety sentencing large corporations health and safety health and safety Health and Safety Executive heave Higher Fines Honey Rose v R How to appoint an adjudicator HSE Insolvency insolvent insurance Insurance Act 2015 insurance bill Insurance Broker insurance claim insurance cover Insurance Disclosure Insurance Disclosure insurance dispute insurance dispute solicitors Insurance Warranties ISO 45001 join us joint venture Judicial Review latest news Law Lawyer legal 500 legal advice privilege Legal Expense Insurance legal professional privilege legal retainers Liability Liquidated Damages Litigation litigation privilege local bodies magistrates’ courts Major Property Damage Manufacturing Martinisation material breach Mediation Michael Appleby Micheal appleby modern methods of construction (MMC) modular construction Mr. Gutaj Notice of adjudication panel firms party wall Performance Bond planning powers of an adjudicator pre-fabrication procurement procurement injunction procurement model Property Damage property danage Public Contract Public Contracts Public Contracts Regulations public procurement public procurement challenges public procurement relationship public sector Publicity Order PUWER recruitment regulation 11 Relief Resolution riot Riot Compensation Act 2016 Risk Risk Assessment safety in the workplace Sanctions Self-build sentence sentencing sentencing guidelines Serious Fraud Office SME Sneller Sony specialist risk and safety consultant Statute Barred Sub-Contractors subrogation subsidance subsidence TCC TCC Guidance team Technology and Construction Court The Adjudicator’s Decision and Costs The Enterprise Act The Lord Young Reforms The Powers Of An Adjudicator The Public Contracts Regulations 2015 The referral notice and response Training tree root UK Underwriters Warehouse insurance Warranties waste water damage WEEE What is Adjudication? what should an adjudication refal notice contain work equipment

Search The Site

Accreditations

 

The Legal 500 - The Clients Guide to Law Firms


Contact Us Now For Advice And Guidance

Enter your name
Enter your surname
Enter your Email
Ask us a Question?